Minutes of Monthly Union Meeting with AIPEU, Group-C Bhubaneswar Dvnl Branch, BBSR held on 13.09.2012 at 10.30 hrs

P R E S E N T


Administration Side

Union Side
S/Sri
Sri A.K. Nayak, SSPOs, BBSR Dn.
1.
B. Samal,  Postmaster, Sahidnagar MDG
Dvnl. Secy
Sri G.P. Kar,  ASPOs (Hqrs)
2.
Prasanna Kumar Mohanty, O A , Divisional Office
WC Member

3.
Tapan Kumar Sahu, P A, Bhubaneswar GPO
WC Member

Item No.
O l d   i t e m s
1-2/ 11




This has a reference to S B Order No. 02 / 2011 communicated vide Directorate’s letter No. No.113-07/2008-SB, dated 08.02.2011 clarifying S B Order No. 25 / 2010 for settlement of deceased claim cases where in it has been told that the value of stamps on Affidavit differs from State to State as it comes under the State Stamp Act and Circles can circulate the value of stamps as per their State Stamp Act.
Thus, it is requested to obtain the value of Stamp paper that will be used for obtaining Affidavit, Letter of Indemnity and Disclaimer certificate of Affidavit for settlement of deceased claim cases and circulate to all concerned for information and necessary action.
Reply
PRI (P), Bhubaneswar has been reminded to take follow-up action in this regard. (Action: S B  Branch)
04-2/11
Revision of MDW of Bhubaneswar G.P.O.
Reply
The Draft MDW of BBSR GPO has been received and it is under examination.    (Action  :  Mail– Branch)
01-5/12
Change of officials working in SB branch for more than the prescribed period as enjoined in POSB manual, Vol-1 – case of APM (Certificate), Bhubaneswar GPO.
Reply
Clarification has not yet been received from CO.AD(FS) will be addressed demiofficially. (Action: SB  Br.)
01-07/ 12
Change of working hours of Sahidnagar MDG and installation of Closed Circuit Camera in the basement where the mail branch is functioning without any supervisor:
The Mail, Sorting and Delivery branch are being operated in the basement of the P O building and the Postmaster sits in the ground floor. Thus, direct supervision of these branches personally by the Postmaster is being prevented. When the Postmaster comes to the basement for supervision, the counter transactions are being affected compelling the customers to wait and inviting resentments. Installation of C C Camera can help the Postmaster in correctly supervising the Mail branch. Secondly, since the 1st mail is being received daily through MMS at 6.50 AM, the bags are remained unopened till 9 AM. Thus, the working hours of this office requires to be changed so that cutting of bags, facing/stamping/sorting of articles and  data feeding in postman module etc. will be finished in time and the beat out can be ensured rightly at 10.30 hours.
Reply
The report of ASP I/C is awaited in the matter.                                             ( Action: BD/Mail  Branch)
05-7/12
Modification of Form-E under SCSS and eMO Form :
Form E under SCSS which is designed for closure application form does not contain the seal and signature of the sanctioning authority and thus found defective. Similarly the eMO application form is just the opposite to what has been designed in the package which put the Counter P A, especially the new entrants into difficulty during booking.
Reply
Necessary instruction has been sought for from C.O.  The Union is requested to take up the matter at C.O. level                                                                                                                                  ( I / C)
01-8/12
Clarification on accepting nomination in case of SB and TD Accounts by S Os / MDGs :
As per Rule – 22 (5) (Page-20, POSB Manual, Vol. I, Third Edition, corrected up to August-2011 by K J Singh ), it has been instructed that for centralized schemes, on receipt of information from HO,
SOs should enter the nomination number intimated by H O and other particulars of nominee in the concerned account in System Software for centralized schemes.  Again, Para 8 of Annexure – I under Rule 199 (page 287 of the above Manual), it has been instructed that nomination in respect of POSB Schemes will now be done at Mukhya Dak Ghars with effect from 01.06.2002 including continuation of nomination at HO. Here there is no specification whether MDGs will do nomination works in case of centralized schemes or not.
As such, it is requested to arrange issuance of necessary clarifications in this regard.
Reply
Since the matter is required to be decided at higher level, the fact has been intimated to C.O. for further action at C.O. level.                                        .                                                          ( I / C)
02-08/12
Immediate dequaterisation of Acharyavihar S O with complete civil and electrical works:
It has come to the notice of this union that the post attached quarters of Acharyavihar NDT SO is completely uninhabitable with soaked walls and floors, damaged windows and doors, dangerous electrical wiring and unsuitable fixtures / fittings. In addition, the post office itself is functioning in a single room without any additional space for the GDS to sit and there is no stock /store room for the PO also. The inside view of the PO through sub-standard networking for computerization with no server rack surrounded by damaged table and rack and without any visitors’ chair and the outer look with damaged roof of the public place and faded sign board certainly put several  questions on the look and feel good concept of the Department.
As such, it is requested for immediate dequaterisation of Acharyavihar NDT SO with complete civil/electrical works including supply of suitable furniture.
Reply
Executive Engineer, PWD Division No.4 has been addressed to take up necessary repairing and maintenance work. The SPM also met the concerned authorities for early repairing work.
(Action  :   D – Branch)
05-08/12
Provision of one more ladies toilet at ground floor of BBSR GPO and ensuring regular supply of water.
Reply
A.E.E., Civil Sub Division, Bhubaneswar has been requested to make provision for one more lady’s toilet in the ground floor of G.P.O.                                                                                                            (Action  :   D – Branch)
Item No.
New I t e m s
01-09 / 12
Grant of admissible TA / DA to P As appointed after taking in-house training.

As brought to the notice of this union, the officials who have been appointed as P A with 15 days local in house training are being deprived of getting admissible TA / DA when deputed to PTC for formal induction training in spite of the fact that their Service Books are already opened and usual pay and allowances are drawn and disbursed to them for the entire training period.
It is requested to pass all such pending T A bills.
Reply
The matter has been referred to C.O.                                                                                   (Action: Acct.Branch)
02-09/12
Grant of MACP with retrospective effect to officials earlier deprived due to average APAR and subsequently granted.

It has come to the notice of this union that the officials earlier deprived of getting MACP due to below bench mark, though granted subsequently, yet not from the date of their eligibility but from a date the APARs were reviewed to be “Good”. As far as our knowledge goes, there was no clear mention regarding date of effect of such cases in the recommendations of 6th CPC. The cases of Sri Jashobant Baliarsingh, PA, Ashok Nagar MDG and Sri Surendra Nath Das, OA, PSD, Bhubaneswar (Retired) may be taken as example. Though the above officials were entitled for MACP w.e.f. 01.09.2008, they were granted w.e.f. 01.04.2010 after review of the APAR by the Screening Committee.
Thus, it is requested to observe fundamental principles of natural justice and grant MPCP to such officials from the date of their eligibility interpreting the rules in favour of the officials in absence of any specific instruction.
Reply
The cases will be examined on receipt of individual application from the concerned official.
(Action  :   Staff – Branch)

03-09/12
Regularization of electricity of Banamalipur SO.
Reply
House owner/ ASPOs I/C, BBSR North subdivision will be addressed in this regard.          (Action  :   D – Branch)

The next monthly meeting with the Union will be held on 11.10.2012. Agenda, if any, for discussion, may be submitted by 28.09.2012. No separate letter will be issued for submitting agenda and agenda received after 28.09.2012 will not be entertained.

No.B.9-1/Ch.IV,                                                                                      Dated at Bhubaneswar, the 13th September 2012

Copy for information and necessary action to:

1.     The Secretary, AIPEU, Gr.C, Bhubaneswar Dvnl Branch & Postmaster Sahidnagar MDG.
2.     The Sr Postmaster, Bhubaneswar G.P.O., Bhubaneswar – 751001.
3.     The A.S.P.Os. (Hqrs), O/o SSPOs, Bhubaneswar Division, Bhubaneswar-751009.
4.     The A.S.P.Os. I/C, Bhubaneswar North Sub-Dn, At-Bhubaneswar G.P.O.
5.     The Inspector, Posts, Bhubaneswar South Sub-Dn, BBSR/, Nimapara Sub-Dn, Nimapara-752106.
7.     All Branches of Divisional Office, Bhubaneswar. They are requested to submit compliance report on all items within a week.
Sr. Supdt. of Post Offices
Bhubaneswar Division
Bhubaneswar-751009