The
JCM Standing Committee meeting was held on 23/08/2013 at 1030 hrs, under the
chairpersonship of Member(O). Minetes of the meeting are enclosed for
information and necessary action at your end.
Minutes of the JCM Standing
Committee Meeting held on 23/08/2013.
The
JCM Standing Committee meeting was held on 23/08/2013 at 1030 hrs. in the Dak
Bhavan under the chairmanship of Member (O). The following were present:-
Official Side
1.
Shri Kamleshwar Prasad, Member (O) - in chair.
2.
Shri S.K. Sinha, CGM (MB&O).
3.
Shri Tilak De, DDG (Estates & MM)
4.
Shri V.K. Tiwary, DDG (R&P).
5.
Shri Anil Kumar, DDG (Estt).
6.
Shri V.P. Singh, DDG (P).
7.
Shri Vineet Pandey, DDG (FS)
8.
Shri L.N. Sharma, DDG (Training)
9.
Smt. Savita Singh, GM (PLI)
10.
Shri Arun Malik, Director (SR & Legal)
Staff Side:
1.
Shri K.V. Sridharan, Leader Staff Side.
2.
Shri M. Krishnan, Secretary General, NFPE
3.
Shri D. Theagarajan, Secretary General, FNPO
4.
Shri Giri Raj Singh, Secretary, Staff Side
5.
I.S. Dabas, General Secretary, A.I.P.E U, Postmen & Gr. ‘D’
6.
Shri T.N. Rahate, General Secretary, NUPE, Postmen & Gr. ‘D’/MTS
Director (SR) welcomed all the members of the staff side and the officers of
the Department in the meeting. He had apprised that some of the items
wherein action has been completed and communicated to the staff side, have been
deleted from the list of agenda items. Thereafter Shri K.V. Sridharan,
Leader, Staff Side thanked the chairman for convening the JCM Standing
Committee meeting.
With the permission of the chair, the agenda items were taken up and after
discussions on each item following decisions were taken:-
1. Standing Committee Meeting held on
18.12.2012
Sl. No.
|
Agenda Item
|
Decisions taken
|
Action By
|
1.
|
Cadre Restructuring for all Non-Gazetted
Group B & C cadres
|
The staff side was informed
that as per the discussion held on 02/08/2013 the cadre restructuring
committee will be re-constituted.
It was assured that the
committee will be constituted within one week and the first meeting of the
committee will be held within a month.
It was also decided that the
draft of the Salim Haque committee will be discussed in the first meeting.
|
DDG (Estt)
|
2.
|
Creation of System Administrators Cadre.
|
This item was included in the
agenda item and decided that the issue of system administrators will be
considered in the new cadre restructuring committee likely to be constituted
within a week’s time.
|
DDG (Estt)
|
3.
|
Computation of proper norms for work
allotment to existing System Administrators and grant of certain essential
amenities.
|
This item was included in the
agenda item and decided that the issue of system administrators will be
considered in the new cadre restructuring committee likely to be constituted
within a week’s time.
|
DDG (Estt)
|
4.
|
Request for discontinuance of the practice
of obtaining fidelity / security bond from the employees handling cash.
|
This item was also included in
the agenda list at the last moment on the request of staff side. It was
decided that the proposal will be examined on file and reply will be given to
the staff side in the next JCM (DC) meeting.
|
DDG (PO & CP)
|
5.
|
Protection of pay of the defunct scale of
PO & RMS Accountants who opted for general line under Directorate letter
No. 2-22/88 - PE I dt. 01.12.92.
|
Detailed compliance of pay
fixation & consequent revision of due pensionary benefits is still
awaited from Punjab Circle. The issue of extending the same benefits as
conferred in the case of Sh. Natha Singh will be considered on receipt of the
compliance as already decided.
|
DDG (Estt)
|
6.
|
Revision of Cash Allowance to the SPMs
handling cash in the absence of treasurer.
|
It was informed to the staff
side that the file is currently with IFW and the matter will be expedited.
|
DDG (Estt)
|
7.
|
Conveyance of cash with police escort-
Problems there on.
|
There are two issues under this
item:-
(i) Conveyance of cash with
police escort – this issue has been closed.
(ii) Fixing of line limit – A
committee has been constituted under the chairmanship of DDG
(CP&PO). The committee will meet on 26/08/2013.
|
DDG (CP&PO)
|
8.
|
Fixing Norms / Time Factors to Postal
Stores Depot; Circle Stamp Depot & creation of establishment.
|
The staff side was informed
that this issue will be addressed in the IT Modernization Project.
|
Item closed.
|
10.
|
Allowing to appear in the Departmental Exam
like IPOs – case of physically handicapped officials.
|
The matter is under
consideration in consultation with Ministry of Social Justice, the nodal
Ministry for notification of identification of the post for reservation in
Department of Posts for persons with disabilities. It is pending with
that Ministry and the matter is being pursued with them.
|
DDG(P)
|
11.
|
Transfer of all HSG I Posts to General line
|
As per the existing RRs, HSG I
recruitment is done from general line (from LSG, HSG II cadre) and through
IPO line. This provision was disallowed by DoPT and the matter has now
been referred to DoPT in totality to enable DoP to revise the RRs so that all
HSG posts can be transferred to General Line.
|
DDG(P)
|
12.
|
Payment of honorarium to supervisors & Staff
of Divisional offices for processing of PLI and RPLI proposals.
|
The case for change of
honorarium as incentive was taken up earlier with IFW Division. For
calculating incentive for each item of work, IFW has asked for devising new
norms for items of work being carried out at Divisional Office.
Meanwhile, under the ongoing FSI project all the PLI / RPLI operations are
further being decentralized to CPC / HO level. Subsequent to
implementation of FSI the time factor for all processes on the new insurance
software will be available for calculating workload for staff / supervisor
working as per the new work flow in CPCs. Once the required norms are
arrived the matter of incentive beyond a minimum threshold payable to CPC
staff will be taken up.
|
CGM (PLI)
|
13.
|
Grant of OTA/ Excess Duty Allowance to the
SPMs working in single / Double handed Post offices.
|
OTA is not admissible to
SPMs. The matter of introduction of an extra duty allowance to the
operative staff of the Department is under examination in consultation with
Nodal Ministries. However, it may not be out of point to mention that
in absence of admissibility of OTA to SPMs, the question of grant of extra
duty allowance may not arise.
|
DDG (Estt)
|
14.
|
Counting the training period for benefits
of promotion under TBOP / BCR scheme
|
The matter is under
consideration in consultation with Department of Legal Affairs and Department
of Personnel & Training.
|
DDG (Estt)
|
15.
|
Holding of examination for filling up to
posts of AMM in MMS
|
No RRs are currently available
for Assistant Manager (MMS) and the feeder cadres and this is preventing the
Department from holding examination. However, required documents and
inputs to frame the RRs are being obtained.
|
DDG (P) /
DDG (Estt)
|
16.
|
Holding of DPC for filling up the posts of
Deputy Manager MMS
|
The DPC will be held within a
period of three months.
|
DDG(P)
|
17.
|
Appointment to the grade of Supdt. Stg. In
RMS
|
The DPC will be held within a
period of three months.
|
DDG(P)
|
18.
|
Acute shortage of ‘C’ Bags.
|
The staff side agreed that
there is no shortage of ‘C’ bags now.
|
Item closed.
|
19.
|
Implementation of recommendation of the
5th CPC with regard to payment of cash handling allowance to treasurers
and Asst. Treasurers in Post offices.
|
It was decided that the
detailed proposal will be sent by the staff side and will be examined by the
Establishment Division. If some relevant points are raised by the staff
side and which help to resolve the issue, the same will be included and the
proposal will be referred tenth time, to the M/o Finance for consideration.
|
Staff side
DDG (Estt)
|
20.
|
Allot 19% Group B vacancies for General
line and permit all Group C official in Postal, RMS, Admn. and Postal A/Cs
with minimum 20 years of service to appear in the exam by dispensing with
present reservation of posts to RMS & Admn. Staff.
|
The staff side was informed
that a committee has been constituted under the chairmanship of DDG (R&P)
which will meet on 29/08/2013 and the report of the committee will be
submitted within a period of 15 days.
|
DDG (R&P)
DDG(P)
|
21.
|
Anomaly in the preparation of PA gradation
list. Date of confirmation should not be taken now and date of appointment be
taken for construing seniority. Fixing seniority based on the date of
confirmation in unconstitutional and discriminatory and dropping of
confirmation examination.
|
The staff side was informed
that the problem in this case is only in Tamil Nadu Circle. It was
decided that the issue will be taken up separately with Tamil Nadu
Circle.
|
DDG(P)
|
22.
|
Pay protection to employees who seek
transfer to a lower post under FR 15 (a)/transfer under Rule 38.
|
DoPT’s OM No. 16/4/2012-Pay-1
dated 05/11/2012 clarifies the issue.
|
Item closed.
|
24.
|
Construction of Departmental Buildings for
Postal Accounts Offices at Hyderabad, Trivandrum and Patna.
|
The staff side was intimated
that the PAO office in Trivendrum shall be accommodated in the new building
at Poojapura. Postal Account Office for Patna has also been approved in
EFC meeting, whereas the proposal of Hyderabad Postal Accounts Office has not
been acceded to by the Planning Commission in the EFC Meeting.
|
Item closed.
|
PENDING ITEMS IN THE LAST DC
(JCM) & STANDING COMMITTEE MEETING ON JCM SUBJECT
JCM (DC) Meeting hold on
28.12.2012
Sl. No.
|
Agenda Item
|
Decisions taken
|
Action By
|
1.
|
Grant of higher rate of HRA in respect of
offices situated in urban limits.
|
In the last JCM (DC) meeting
held on 28/12/2012 a point was raised by staff side that everytime in a
proposal in respect of grant of higher rates of HRA by circle it is required
that the same should be accompanied by Establishment review figures. The
official side concluded that this is not required as per MoF rules. It has
been decided in this meeting that this decision taken in the last meeting
will be followed.
|
Item closed.
|
2.
|
Imposing unjustified conditions for
appearing IP Examination for the departmental quota vacancies.
|
The matter is being examined.
|
DDG(P)
|
3.
|
Construction of new building at Kodialbail
HSG I SO in Mangalore Division, Karnataka Circle
|
It was decided that a report
will be obtained from circle to ascertain whether the area of the post office
is sufficient as per SOA and functionally convenient; failing which action
will be taken accordingly to resolve the issue. As regards construction
of new building, the proposal was not accepted because the building is safe
for occupation as reported by SE (Civil), Bangalore.
|
DDG (Estate & MM)
|
4.
|
Construction of new departmental building
for Itanagar Head Post office.
|
Construction has already
started in May, 2013. Item closed.
|
Item closed.
|
6.
|
Uniform application of incentive for IMT
work
|
The proposal for the incentive
for IMTS work done in the post offices has already been worked out in detail
along with its financial implication. The related file was submitted to
JS & FA and the said file has been received back with some
querries. The file is being submitted again with compliance and seeking
further orders.
|
DDG (FS)
|
7.
|
Recovery of huge amount being interest Paid
on PPF Account opened on Self name and also in the name of Minors (i.e. on
two accounts) prior to 06.12.2000 – case of Karnataka Circle
|
This office has already issued
order to stop recovery of interest from the officials at fault on
08/02/2012. Since the Accounts were transferred to the Bank and RBI is
the controlling authority of the Bank, the S.K. Region, Bangalore wrote a
letter to RBI to issue order to the said Bank to get recover the excess paid
interest on behalf of the Department of Posts. Matter has also been
taken up with the RBI by this office. Reply is awaited from RBI.
|
Item closed.
|
8.
|
Fixation of pay of MTS (Group C officials)
who were granted ACP-I and ACP-II upgradations prior to 01.01.2006 consequent
upon implementation of 6thCPC recommendation in the light of
Postal Directorate’s latest order no. 1-20/2008-PCC (Pt.) dtd. 18.07.2011.
|
The issue is currently under
examination.
|
DDG (Estt)
|
9.
|
Dies non period should also be taken for
reckoning of continuous service while granting ACP/MACP to officials.
|
It was decided that the issue
will be examined whether the Dies non should be taken for reckoning of
continuous service in such cases. Reply will be sent to the staff side
separately, after examining the proposal within the framework of extant rules
of the Government of India.
|
DDG (Estt)
|
10.
|
Arbitrary recovery of Postage in case of
foreign articles returned due to non availability of service.
|
The matter has been examined
and it has been decided with the approval of Secretary (P) that Maharashtra
circle may refund the postage recovered from the booking clerks who book
foreign articles to those countries where India Post does not have any service.
|
Item closed.
|
11.
|
Fixation of Pay for canteen employees after
Sixth CPC.
|
A clarification will be issued
by the Establishment Division.
|
DDG (Estt)
|
12.
|
Clarification issued on encashment of
earned leave in connection with availing LTC– Payment of difference.
|
Ruling of DoPT on this matter has been circulated to
all Circles for taking appropriate action.
|
Item closed.
|
14.
|
Abnormal delay in filling up of vacant LSG,
HSG II and HSG-I vacancies due to non-holding of DPCs in many circles
|
Instructions have been issued
from time to time to hold DPC meetings as per the schedule prescribed by the
Department of Personnel & Trg (DoP&T). As regards filling up of
the vacancies in HSG.I, a proposal was referred to DoP&T to fill up the
vacancies in HSG.I as per the provisions of existing Recruitment Rules till
finalization of amendment to the existing Recruitment Rules. DoP&T
has approved the proposal. Directorate vide letter No. 4-44/2012-SPB.II
dated 18/04/2013 has issued instructions to all Circles to fill up the
vacancies in HSG.I in PO & RMS Offices as per the provisions of existing
Recruitment Rules by convening DPC meetings by 30/04/2013 and issue the
promotion orders by 06/05/2013.
Subsequently, another letter
dated 27/06/2013 from Member (P) has been issued to all Circles with the
request to ensure that all the vacancies are filled by convening DPC meetings
and through Departmental Examinations.
|
Item closed.
|
16.
|
Denial of relaxed standards to GDS in the
appointment of Postal Assistants in the revised recruitment rules -
regarding.
|
The issue involves amendment of
Recruitment Rules. It is being examined and decision will shortly be
taken in this regard.
|
DDG(P)
|
17.
|
Special drive for residual vacancies.
|
For filling all the unfilled
vacancies of Multi-Tasking Staff and Postman / Mail Guard in Subordinate
offices and Circle / Administrative offices, necessary instruction was issued
to all Circles vide letter No. 45-2/2011-SPB-I dated 18/10/2012 with the
direction to take action to fill up all the vacant posts of earlier years latest
by 30th June, 2013. The drive is over and a status
report from the Circles has since been called for to review the position.
|
Item closed.
|
18.
|
Immediately arrange for filling up of
vacant posts in the cadre of PACO & MTS in Circle Administrative offices.
|
Recruitment Rules for the post
of PA (CO & RO) are being revised. However, a proposal is moved to
operate the old RRs for filling vacant posts in the cadre of PA (CO).
Regarding filling up of the posts of MTS in CO / Admn Offices, necessary
instructions have already been issued to all Circles in October, 2012 to fill
up these posts.
|
DDG (P)
|
19.
|
Promotion of OS to AD (Rectt.).
|
DPC for 4 AD (Rectt)
completed. Item is closed.
|
Item closed.
|
20.
|
Tenure in RMS Head Record
offices/Divisional offices.
|
It was informed by the staff
side that the Rajasthan, Delhi and Orissa circles are not following the
guidelines. It was decided that the instructions will be reiterated to
these circles.
|
DDG (Estt)
|
21.
|
Non-filling of IPO post of Direct recruits
in J & K Circle
|
The Staff Selection Commission,
who allocates the candidates for appointment to various Circles as per the
preference given by the candidates, has been requested vide letter dated
07/06/2013 to give special consideration to nominate / allocate the candidates
of J&K Circle for appointment to the post of Inspector of Posts through
Combined Graduate Level Examination in order to ensure that posts do not
remain unfilled.
|
Item closed.
|
22.
|
Short drawal of Grade Pay – In case of
Pharmacists in P&T Dispensary
|
There is no case of short drawl of grade pay for
pharmacists and the issue has been decided by, Deptt of Expenditure,
Implementation Cell and the orders have been circulated to Circles.
|
Item closed.
|
25.
|
Recovery effected from Commutation of
pension from Postal pensioners who had proceeded on voluntary retirement
during the period from 1.1.2006 to 31.8.2008.
|
DoPT order no. 38-37/2008-PNPW(A) dated 10-12-2009
in this regard have been re-circulated to Circles.
|
Item closed.
|
26.
|
Grant of Grade Pay of Rs. 1800 to Group
D/MTS who retired/expired from service after 31.08.2008 without having been
imparted training.
|
The issue is referred to
Ministry of Finance, Department of Expenditure.
|
DDG (Estt)
|
27.
|
Fixing norms for Postmen work
|
The norms were formulated after
scientific work study by IWSU in 2008. Since five years have already
lapsed, it was decided to conduct another study by Departmental Officials or
by a third party to review the postmen norms. This decision was taken
in a meeting held on 02/08/2013 under the chairmanship of Member(P).
|
DDG (Estt)
|
28.
|
Performing double duty by Postmen on Double
Duty Allowance Basis.
|
The Fixed Monetary Compensation
to delivery staff for performing duty of an absentee Postman by combination
of duties has been revised vide this office Order No.10-7/2001-PE.II dated
24/11/2010.
|
Item closed.
|
29.
|
Provisioning of 10% LR.
|
Clear instructions will be
issued by Establishment Division to all circles.
|
DDG (Estt)
|
30.
|
Irregular commutation of LR strength.
|
This item is closed in view of
item 29.
|
Item closed.
|
31.
|
Fixing standard operating procedures and
uniform code and rules for all Postal Training Centers.
|
It was informed to the staff
side that this issue has been resolved and the staff side was also apprised
of this.
|
Item closed.
|
32.
|
Upgradation of pay as per sixth CPC to
Group ‘C’ cadre in response to Group ‘D’ Selected under blind quota.
|
It was decided that a training
module will be developed for the visually handicapped in the Directorate
within a period of two months and circulated to all circles for compliance.
|
DDG (Training)
|
33.
|
Implementing online facility for all Postal
employees having General Provident Fund (GPF) Account to get information
regarding their GPF accounts directly from the internet.
|
The matter has already been
addressed in the CSI RFP.
|
Item closed.
|
34.
|
Supply of updated Postal Manuals, Volumes
and Reference books to all offices.
|
The concerned Divisions have
been reminded vide letter No.9-13/94-PF (pt.iv) dated 08/07/2013 for
furnishing the material for printing / uploading of Postal Manuals, in the official
website. The action will be completed within a period of three months.
|
DDG (Estates & MM)
|
35.
|
Bifurcation of Bastar and Raigarh divisions
in Chattisgarh Circle.
|
(a) Baster Division: As no
matching savings have been provided by the Circle Office for creation of
additional posts, the proposal for bifurcation of Baster Division to create
Kankar Division is found not feasible in view of ban on creation of Plan /
Non- Plan posts by Ministry of Finance .
(b) Raigarh Division: The
circle has been asked to provide matching savings for creation of posts
required for the proposed Sarguja Division after bifurcation of Raigarh
Division. It has also been asked to furnish the financial implications
involved in bifurcation of Raigarh Division.
|
This part of the item is
closed.
DDG (Estt)
|
39.
|
Review of work load in Business Office.
|
It was decided that a report
will be called for from the circles about the expenditure incurred and the
revenue gained.
|
CGM(MB&O)
|
42.
|
(i) Timely supply of uniform and issue of
Kit Card.
|
It was decided that the
instructions will be issued once again to all Heads of Cirlces for timely
supply of uniform to eligible postal employees. The staff side was also
informed to take up the matter at circle level..
Issue of Kit Card: The
Directorate has called for the comment from all heads of the circles to
explore possibility for issue of kit card on 03/06/2013.
Reply received from the circles
so far is in favour of the issue of kit card to the postal employees, hence
it was decided to agree to the proposal and further necessary action may be
initiated.
|
DDG (Estates & MM)
|
43.
|
Downgradation of HSG II AHRO post in
Maharasthra Circle
|
The proposal will be examined
by the Establishment Division.
|
DDG (Estt)
|
The
meeting ended with a vote of thanks to the chair.
No comments:
Post a Comment