PRESIDENT
Com. Purna Ch. Dash
Mobile : 9439051116
|
TREASURER
Com. Lingaraj Sahoo
Mobile : 9437278723
|
SECRETARY
Com. Bruhaspati Samal
Mobile : 9437022669
|
To
The Senior
Superintendent of Post Offices
Bhubaneswar Division,
Bhubaneswar – 751 009
No. UN-BN/AIPEU-Gr.-C/ 03 – 04/2014, Dated at
Bhubaneswar the 7th April, 2014
Sub: Modification
in MMS Schedule IV with effect from 07.04.2014
Ref.- Divisional
Office Memo No. No: G–49/CH-II, dated 04.04.2014.
Sir,
Inviting a kind
reference to Divisional office memo under reference on the above subject this
is to intimate that while the working hours of BJB Nagar S O is from 9.30 to
17.30 and the same of Ashoknagar MDG is from 10.00 to 18.00 hours, both the
offices have been ordered to wait for the Mail Van beyond the prescribed
working hours. While BJB Nagar S O will hand over the bags at 18.02 hours,
Ashoknagar MDG will hand over at 18.10 hours.
The revised MMS Schedule
has also ignored the traffic problems in Bhubaneswar city. While a period 10
minutes has been given to the Mail Motor from Khandagiri to DDHB Housing Board
Colony with one traffic post only, a period of 4 minutes has been allowed to
reach Ashoknagar MDG from BJB Nagar with 2 traffic posts when the distances are
almost same. There are several other instances in the above revised MMS
Schedule with irrational timing.
As such, this union
requests the SSPOs kindly to look into the feasibility of time factor framed in
the Revised MMS Schedule and restrict the timings within the working hours of
the above offices.
A line of reply on
the action taken is highly solicited.
With regards.
Yours sincerely,
(B Samal)
Secretary
No comments:
Post a Comment