Memo No.             G-49                                                                  Dated at Bhubaneswar the 27.07.2011
ORDER

Sub:        Implementation of Revised MMS Schedule.

                As per instruction of Circle Office for ensuring dispatch of both Speed Post and general Mails by 10.00 hrs to all Post Offices under Bhubaneswar town delivery, an exercise was made at this end in consultation with Senior Postmaster, Bhubaneswar GPO / Manager, NSPC, Bhubaneswar GPO / ASRM, Bhubaneswar RMS / SAS, CO, Bhubaneswar and accordingly a revised Schedule was prepared for all the four MMS vehicles attached to this Division taking best effort to make all type of Mails available to most of the Post Offices by 10.00 hours.
                Now, it is decided to implement the revised Schedule w.e.f. 01.08.2011 (Monday).
                Therefore, all concerned are instructed to make arrangement for receipt and dispatch of Mails at their end strictly adhering to the time of receipt and dispatch of Mails as per revised Schedule, without causing any dislocation from 01.08.2011.
                Copy of revised schedule in _____ folios is enclosed for information and guidance, Post Office which do not figure in the Schedule will continue to receive and dispatch of Mails as usual.  
Encl- As above.
(A.K.Nayak)
Sr. Supdt. of Post offices
Bhubaneswar Division
Bhubaneswar-751 009
Copy to:
1.The Senior Postmaster, Bhubaneswar GPO, Bhubaneswar – 751001.
2-5.The Postmasters, Sahidnagar MDG / Ashoknagar MDG / Bhubaneswar-2 MDG / Utkal University MDG.
6-21The Sub-Postmasters, Budheswari Colony/ VSS Nagar/ Bhoinagar/ Nayapalli/ Baramunda Colony/ RRL/ Sainik School/ M.R.Colony/ KIIT/ Saileshreevihar/ Chandrasekharpur/ SERly Colony/ Suryanagar/ Rasulgarh/ GGP / BJB Nagar SO.
22-24. The Sub-Postmasters, Dumu Duma Housing Board Colony/ Khandagiri/ CRP Line for information. They will send all outward Mails with Mail List through their respective GDS Pkr-cum MC to IRC Village SO as to hand over the Mails to MMS at 14.10 hours.
25.   The Sub-Postmaster, IRC Village for information.
26.    The Manager, NSPC, Bhubaneswar GPO, Bhubaneswar for information and necessary action. He should personally supervise the receipt and dispatch of Mails without dislocation.
27.   The ASRM, Bhubaneswar RMS for information and necessary action. He should personally supervise each receipt and dispatch of Mails without any dislocation and to report if any amendment is needed.
28.   The HRO, Bhubaneswar RMS for information and necessary action.
29.   The SSRM, RMS “N” Division, Cuttack-1 for information.
30.   The Asst. Director (Mails), O/o the Chief PMG, Orissa Circle,  Bhubaneswar – 751001 for information and necessary action.
31.   The ASPOs I/c, Bhubaneswar North Sub Division / IPOs, Bhubaneswar South Sub Division for information. They will issue suitable instruction to the offices under their control for causing receipt and dispatch of Mails as per the enclosed Schedule. They will remain present at the Hqrs on 01.08.2011 i.e. on the day of implementation and monitor smooth functioning of MMS without any dislocation of Mails and report this office on any changes to be made.
32-35. Concerned MMS Drivers.
36.   Office copy.
Sr. Supdt. of Post offices
Bhubaneswar Division
Bhubaneswar-751 009
M.M.S Schedule No.I                                          (Log Sheet)   w.e.f.   
Vehicle No:OR-02A-0963                         K.M.Reading ( Ending)      ....................
                                                                                       K.M.Reading (Starting)        ..................
Date            :                                                                      K.M.Covered                       .................
Destination
Schedule Time
Actual Time
Remark
Arrival
Departure
Arrival
Departure
Garage

05.00



BBSR RMS
0505
05.25


To receive SP mail for NSH and Genl mail for BBR GPO, Ashok Nagar, Budheswari Colony, Rasulgarh,GGP,Bhoinagar, Utkal university
BBSR GPO
05.30
05.40


To hand over the SP bags to NSH and Genl. MBs to GPO.
Ashok Nager
05.45
05.55


To hand over the Genl MBs to Ashok Nagar
Budheswari Colony
06.05
06.10


To hand over Genl MBs to Budheswari Colony
VSSNagar
06.45
06.50


To hand over the Genl MBs of Rasulgarh and GGP.
Sahid Nagar
07.00
07.05


To hand over the genl MBs to Sahidnagar
Bhoinagar
07.15
07.20


To hand over the genl MBs to Bhoinagar
Utkal University
07.25
07.30


To hand over genl MBs for Utkal University
BBSR RMS
07.45
08.00


To receive SP mail for NSH and genl mail for Nayapalli, Barmunda Colony, ,Khandagiri, Dumduma,CRP sqr, IRC village,RRL,Sainik School,MR Colony, ,KIIT, SailashreeVihar, CSPur,SERly Proj,
BBR GPO
08.05
08.35


To hand over SP mail to NSPC and receive SP mail from NSPC  & A/for Nayapalli, Bermunda colony,Khandagiri,Dumduma,CRP,IRC, A/C bag  from GPO for Nayapalli, Bermunda colony,Khandagiri,Dumduma,CRP,IRC ,RRL, Sainik School, M R Colony, KIIT,S.Vihar,CS Pur, S E Rly Project.
Nayapalli
08.50
08.55


To hand over the genl & SP mail & A/c Bag to Nayapalli
Baramunda Colony
09.00
09.05


To hand over Genl , SP mail&A/C bag
Khandagiri
09.15
09.20


Do
Dumduma HBC
09.25
09.30


Do
CRP Square
09.35
09.40


Do
IRC Village
09.45
09.50


Do
RRL SO
09.55
10.00


To handover Genl mail and a/c bag
Sainik School SO
10.05
10.10


Do
MR Colony SO
10.15
10.20


Do
KIIT
10.25
10.30


Do
Sailashree Vihar
10.35
10.40


Do
C S Pur HBC
10.45
10.50


Do
SERly Project
10.55
11.00


do
BBSR RMS
11.20
11.40


To receive genl mail and left out SPmail if any for GPO and NSH
BBSR GPO
11.45
11.55


To hand over Genl mail to GPO and left out Sp mail to NSH
Garrage
12.00




Name of Driver.....................................                               Signature .................................

M.M.S Schedule No.II                                (Log Sheet)
Vehicle No:           OR-02A-0964                      K.M.Reading ( Ending)     ….................
Date           :                                                          K.M.Reading (Starting)       …...............
                                                                                K.M.Covered …...............
Destination
Schedule Time
Actual Time
Remark
Arrival
Departure
Arrival
Departure
Garrage

14.00



IRC Village
14.10
14.15


Collect SP,Genl Mail & A/C bag from marginally noted offices
Baramunda
14.20
14.25


Do
Surya Nagar
14.30
14.35


Do
Nayapalli
14.40
14.45


Do
SERPC
15.00
15.05


Do
C S Pur HBC
15.15
15.20


Do
Sailashree Vihar
15.30
15.35


Do
KIIT
15.40
15.45


Do
MRC
15.50
15.55


Do
Sainik School
16.00
16.05


Do
RRL
16.10
16.15


Do
Bhoinagar
16.20
16.25


Do
Utkal University
16.30
16.35


do
CSO
16.40
16.45


Genl Mail
Sahidnagar
16.50
16.55


Collect SP,Genl Mail & A/C bag from marginally noted offices
Rasulgarh
17.00
17.05


do
B S Colony
17.10
Mails Exchanged at Road Point
do
BJB Nagar
17.15
17.20


Do
Ashok Nagar
17.25
17.30


Do
BBSR RMS
17.40
17.55


Hand over all genl mails to RMS
SPC,BBSR (GPO)
18.10
18.25


Hand over all SP mail to NSH and A/c bags to GPO and collect Genl mail / SP mail from GPO/NSH
BBSR RMS
18.35
18.50


Deliver Genl/SP mail to RMS
BBSR GPO (NPO)
19.00
19.35


Collect Genl  & SPmail from GPO/NSH
BBSR RMS
19.40
19.55


Deliver Genl /SP mail at RMS
Garrage
20.00




Dum Duma, Khandagiri & CRP line PO will send their Mails with Mail List through their respective GDS Pkr-cum-MC to IRC Village PO so as to hand over the mail to MMS at at 14.10 hrs.

M.M.S Schedule No.III                   (Log Sheet)  w.e.f.

Vehicle No:           WB-03A-8454                    K.M.Reading (Ending)  ...................
Date           :                                                                  K.M.Reading (Starting)  ..................
                                                                                       K.M.Covered                ..................

Destination
Schedule Time
Actual Time
Remark
Arrival
Departure
Arrival
Departure
Garage

07.00



BBSR RMS
07.05
07.25


Receive SP Mails and AIR Mail for Hyderabad
NSH BBR GPO
07.35
07.45


DVD SP Mail at NSH
AIR PORT
07.55
08.05


DVD AIR MAIL at Air Port
BBSR RMS
08.15
08.25


Receive genl mail fpor GPO/CPMG Office and SP mail for NSH & Gel mail for BBSR-2, Aerodrome Area, BJB Nagar, BBC.
BBSR GPO/SPC/ CPMG
08.30
08.45


Delivery of Genl mail at GPO/CPMG Office & SP mail at NSH. Receive SP mail /A/C bag for BBSR-2,Aero Area,BJB Nagar, BBC from NSH /GPO.
BBSR-2
09.00
09.05


Dvd genl /SPmail & A/C bag.
Aerodrome Area
09.15
09.20


do
B.J.B. Nagar
09.30
09.35


Do
BBC
09.40
09.45


do
BBSR GPO
09.55
13.00
CASH DUTY


13.00
15.00


Off
BBSR GPO
15.00
17.40
CASH DUTY

To receive genl mail from GPO
BBSR RMS
17.40
17.50


Deliver genl mail at RMS
 Garrage
18.00




Name of Driver.................................Signature ..................................

MMS schedule No. IV      Log Sheet w.e.f._____________
Vehicle no- WB-03-A-8453.
Name of Offices
Schedule Arrival
Actual Arrival
Schedule Departure
Actual Departure
Remark
Garage


08.50


RMS
08.55

09.00

 Receive SP/genl mail for SPC/GPO/CPMG(O)
GPO/CPMG(o)/NSH
09.10

09.15

Dvd SP/genl mail at NSH/GPO/CPMG(O)
RMS
09.20

10.00

To receive AIR mail for Indigo flight and genl mail/SP mail for GPO/NSH
AIR PORT
10.15

10.40

To deliver Indigo mail
GPO
10.55

11.05

To deliver Genl/SP mail at GPO/NSH
RMS
11.10

11.30

To receive Genl&SP mail for GPO/NSH & AIR mail for ND/MB/Chen/Beng.
GPO
11.35

11.45

To deliver Genl & SP mail at GPO/NSH
AIR PORT
12.00

12.15

To deliver AIR mail
RMS
12.25

12.45

To receive AIR mail & mail for PSD/CSD/RLO
PSD/CSD/RLO
12.55

13.10

To deliver mail for PSD/CSD/RLO
Air Port
13.30

13.45

To deliver Air Mail
BBSR GPO
14.00

14.05

To receive Genl/SP mail from GPO/NSH
RMS
14.10

14.30

Dvd Genl/SP mail at RMS & receive AIR Mail for IC877,169 KF
Air Port
14.45

15.10

DVd Air Mail
BBSR GPO
15.25

15.35

Receive Genl/SP mail from GPO/NSH
RMS
15.40

15.50

Dvd  Genl & SP mail
PSD/CSD
16.00

16.20

Receipt of mail from PSD/CSD/RLO
RMS
16.30



16.30
18.00
Break
GPO
18.10

18.20

Receipt of Genl mail from CPMG(O)/GPO/MBC
RMS
18.25

19.00

 Delivered at RMS
BBSR GPO
19.05

20.30

 Receipt of Genl/SP mail from GPO/NSH
RMS
20.35

20.40

Delivered at RMS
Garage
20.50




               
 Name of Driver.....................................Signature ..................................